✅ Running today
No planned works on the RER B today.
As of 15 September 2026, the RER B is running normally — no planned works are in effect right now.
The RER B is being modernised through 2026: SNCF and RATP are renewing track, ballast and signalling in the central tunnel under Paris, and working on the CDG branch. The status box above is computed from today's date, and the table below lists every closure phase, which sections are affected and how to get around them.
Closure phases
| Dates | Section closed | Hours |
|---|---|---|
| 25 Jul 2026 – 6 Aug 2026 | Gare du Nord ↔ Bourg-la-Reine | All day |
| 7 Aug 2026 – 16 Aug 2026 | Gare du Nord ↔ La Croix de Berny / Robinson | All day |
| 1 Jul 2026 – 31 Aug 2026 | Mitry-Claye / CDG2 ↔ Châtelet–Les Halles | All day |
How to get around it
Line 14 is free for the duration of the central closure (25 Jul – 16 Aug 2026) as a replacement for the RER B under Paris. Tap in and out without a ticket at any line 14 station.
Métro line 4 is the second main reroute between Gare du Nord, Châtelet and Denfert-Rochereau.
Going to CDG airport? Take Roissybus from Opéra, or Transilien K from Gare du Nord to Mitry-Claye. Allow at least an extra 45 minutes.
Is this a strike?
No. These are planned modernisation works — ballast, track and signalling renewal, preparing the RER B for NExTEO (next-generation automatic train control). Nothing to do with a strike or a union action. Check live strike status →